{"schema":"tacitus-desk-input/1","case_id":"bucharest-connection","edition":"primary","as_of":"2026-07-13","task":"After two-way traffic reopened on the Giurgiu–Ruse bridge, should a coach operator sell a 30-minute onward connection in Bucharest? Write the operating decision as of 13 July 2026.","output_format":"Operating decision","sources":[{"id":"bridge-notice","title":"Two-way traffic restored on the Giurgiu–Ruse Danube bridge","publisher":"Romanian Border Police, Giurgiu Territorial Inspectorate","date":"2026-06-30","url":"https://www.politiadefrontiera.ro/ro/giurgiu/i-redeschiderea-circulatiei-pe-podul-dunarii-giurgiuruse-43844.html","locator":"Opening paragraph, notice of 30 June, relaying the Bulgarian authorities’ confirmation via the Giurgiu contact centre (Romanian)","excerpt":"circulația în ambele sensuri de mers, pentru toate categoriile de vehicule, este restabilită.","role":"decision evidence"},{"id":"schengen-decision","title":"Council Decision (EU) 2024/3212 on internal land borders","publisher":"Council of the European Union","date":"2024-12-23","url":"https://eur-lex.europa.eu/eli/dec/2024/3212/oj/eng","locator":"Official Journal publication of 23 December 2024, Article 1. Decision adopted on 12 December.","excerpt":"From 1 January 2025, checks on persons at internal land borders with and between Bulgaria and Romania shall be lifted.","role":"decision evidence"},{"id":"traveller-guidance","title":"Travel documents after the land-border change","publisher":"Romanian Border Police communiqué carried by AGERPRES","date":"2024-12-30","url":"https://agerpres.ro/comunicate/2024/12/30/comunicat-de-presa-politia-de-frontiera-romana--1409176","locator":"Paragraph beginning “Este important de reţinut” and the following paragraph on occasional identity checks (Romanian)","excerpt":"trebuie să aibă asupra lor un document de călătorie valabil","role":"decision evidence"}],"attachment":{"id":"bucharest-connection","version":"1.1.0","sha256":"5f3e6972745cb5d853e4caf65952821219f077a52992e937d53d9327ab257696","recipient":"Director of Network Planning","format":"Operating decision","profile":{"role":"Network planning for a coach operator serving Sofia and Bucharest.","houseRule":"Sell a connection only if 19 of 20 comparable arrivals leave passengers at least 10 minutes to board. Count a missing arrival or cancellation as a failure.","decision":"Decide whether to offer the proposed shorter same-terminal connection and what passenger wording to approve."},"sections":["Availability decision","What the notice changed","Service-standard result","Owner and next test"],"method":["Keep infrastructure availability, border checks and journey-time evidence separate.","A timetable promise needs the operator’s own observations and service rule."],"procedures":[{"id":"tc_market_change_triage","kind":"capsule","version":"1.0.0","sha256":"c9e028629c137c5063af5e0a62c644859ec73fed4778ce17eb3d4a7a95c5c768","guidance":"Identify the document’s issuer, jurisdiction, legal status, version and stated effective dates. Match the named product and actor to definitions only where the saved material supports that mapping. Distinguish a proposal, guidance and operative requirement. Compare the prior assessment with the new source without importing unstated law. Separate potentially affected products, supported exclusions and applicability still requiring specialist review. Retain exceptions and transitional conditions."},{"id":"tc_decision_brief","kind":"artifact","version":"3.7.0","sha256":"f9d08f2ee3638754a6c95b3ab38a76c2a17cf9cd1f58e3f750bb27d6446f5018","guidance":"Decision; relevant change; evidence and attribution; alternatives; open questions; next action and owner."}]},"graph":{"nodes":[{"id":"route","type":"scenario","label":"Illustrative northbound Sofia–Bucharest coach, via Ruse–Giurgiu, connecting at the same Bucharest terminal"},{"id":"bridge","type":"crossing","label":"Giurgiu–Ruse road bridge over the Danube","source":"bridge-notice"},{"id":"two-way","type":"infrastructure-status","label":"Two-way traffic for all vehicles resumed at 10:00 local time on 30 June 2026","source":"bridge-notice"},{"id":"land-checks","type":"policy-scope","label":"Routine checks on persons at internal land borders with and between Bulgaria and Romania lifted from 1 January 2025","source":"schengen-decision"},{"id":"travel-document","type":"passenger-condition","label":"Valid travel document required for the journey. Romanian officers may still conduct identity checks.","source":"traveller-guidance"},{"id":"existing-transfer","type":"scenario","label":"Existing bookable connection in the example gives 60 minutes between scheduled arrival and onward departure"},{"id":"proposed-transfer","type":"scenario","label":"Sales proposes a connection with 30 scheduled minutes at the same terminal"},{"id":"boarding-floor","type":"scenario","label":"Example service standard requires at least 10 minutes between actual arrival and onward departure on at least 19 of 20 comparable runs"},{"id":"arrival-log","type":"synthetic-data","label":"Twenty consecutive illustrative arrival-delay records on the same northbound service, 1–10 July 2026. Cancellations or missing arrivals count as failures."},{"id":"transfer-check","type":"calculation","label":"Connection acceptance calculation produced from the illustrative dispatch record and service standard."},{"id":"signoff","type":"scenario","label":"Network Planning owns ticket availability. Dispatch supplies the next 20 comparable arrivals, including missing or cancelled runs as failures."}],"edges":[{"from":"route","rel":"crosses","to":"bridge"},{"from":"two-way","rel":"describes","to":"bridge"},{"from":"route","rel":"falls-under","to":"land-checks"},{"from":"land-checks","rel":"qualified-by","to":"travel-document"},{"from":"route","rel":"offers","to":"existing-transfer"},{"from":"proposed-transfer","rel":"would-replace","to":"existing-transfer"},{"from":"proposed-transfer","rel":"tested-against","to":"boarding-floor"},{"from":"arrival-log","rel":"sample-for","to":"route"},{"from":"transfer-check","rel":"computed-from","to":"arrival-log"},{"from":"transfer-check","rel":"applies","to":"boarding-floor"},{"from":"transfer-check","rel":"compares","to":"proposed-transfer"},{"from":"transfer-check","rel":"compares","to":"existing-transfer"},{"from":"signoff","rel":"requires","to":"transfer-check"}]},"calculation":{"id":"coach-boarding-window/v1","scenario":true,"delays_minutes":[4,7,11,2,19,23,6,14,8,18,26,12,0,17,21,5,15,32,10,16],"sample_size":20,"min_boarding_minutes":10,"required_passes":19,"options_minutes":[30,60],"results":[{"connection_minutes":30,"passes":16,"observations":20,"meets_standard":false},{"connection_minutes":60,"passes":20,"observations":20,"meets_standard":true}]}}